Project Start: (Estimates Sent) - March 2025

Project Completion: (Delivery & Installation) - May 2026

Company Name: Ameron Construction

Customer Name: Justin Stoner - Project Manager

Project Name: PSU – Pollock Halls Phase 3

PSU Pollock Halls

Results

The completed detention basin provides approximately 185,000 gallons of underground stormwater storage while delivering a fully integrated, 100% watertight precast concrete system designed for decades of reliable service. All 69 sections fit together as designed, allowing field post-tensioning to be completed efficiently with minimal adjustments. The precision achieved during manufacturing translated directly into reduced installation time, improved jobsite productivity, and a high-quality finished product that met the demanding performance standards established by Penn State University and the project team.

Conclusion

The Pollock Halls Phase 3 detention basin showcases the advantages of engineered precast concrete when precision, durability, and watertight performance are essential. Through strong collaboration and quality-focused manufacturing, Deihl Vault & Precast delivered a critical piece of campus infrastructure that will serve Penn State University reliably for decades to come.

Executive Summary

Deihl Vault & Precast was selected to manufacture and supply the precast concrete components for the Pollock Halls Phase 3 Underground Stormwater Detention Basin at Penn State University. The project consisted of 69 sections of 5-foot by 10-foot reinforced precast box culvert installed in three parallel runs measuring approximately 165 feet each. Designed to provide approximately 185,000 gallons of underground stormwater storage, the system was installed and post-tensioned in three phases to accommodate the project schedule while maintaining structural integrity and complete watertight performance. Through close coordination with Ameron Construction, Clayco, Penn State University, and Concrete Sealants, the project was delivered successfully while meeting demanding engineering and quality expectations.

Background

As part of Penn State University's ongoing Pollock Halls redevelopment, the Phase 3 infrastructure improvements required a large-capacity underground stormwater detention system capable of managing significant runoff while preserving valuable surface space for future campus development. The design called for nearly 500 linear feet of precast box culvert configured into three separate detention chambers, creating a durable underground storage system with a capacity of approximately 24,750 cubic feet, or roughly 185,000 gallons.

Deihl Vault & Precast manufactured all 69 precast sections under controlled plant conditions to ensure dimensional accuracy, consistent concrete quality, and proper reinforcement placement. Due to the overall length of each detention run, the system was engineered to be post-tensioned in the field, requiring extremely tight manufacturing tolerances so every section aligned precisely during installation. The detention basin was constructed in three installation phases, allowing excavation, backfill, and subsequent construction activities to progress efficiently while maintaining the project's overall schedule.

A critical component of the project's long-term performance was achieving a completely watertight structure. Each joint incorporated a double-row sealing system using Concrete Sealants CS-102, CS-235, as well as CS-1500. Working closely with Ameron Construction, the installation contractor, and Clayco, the project's general contractor, DVP helped deliver an engineered solution that combined structural strength, watertight integrity, and long-term durability for one of Penn State's largest campus infrastructure improvements.

partnering with pennsylvania's leading companies

Customer testimonials

"Deihl Vault and Precast has been a critical partner with us in our formation and growth. They consistently keep communication open between estimating, accounting, and dispatch staff. Beyond timely production and delivery to any job we work, their knowledge and insight has proved invaluable to us and our clients. Proper planning is the key to succeeding at any job, no matter the size and scope. The experienced staff at Deihl Vault and Precast always strive to make our life easier and contribute to the success of a project before it ever starts. We have never gone wrong partnering with DVP."

Eli Getgen, EIT, SIT
Project Manager, Sylvania Site Contractors